Our Service
ELGC provides controlled dismantling, relocation and reinstallation of industrial plant and equipment, maintaining asset integrity and recovery quality throughout the process.
Condition Assessment
Controlled Dismantling
Asset Preservation
Transport Coordination
Reinstallation & Recommissioning
Overview
ELGC manages the complete relocation sequence — condition assessment, tagging and documentation, controlled dismantling, preservation during transport and reinstallation with recommissioning support. Our approach protects asset value and maintains recovery quality throughout.
ELGC manages the complete relocation sequence — condition assessment, tagging and documentation, controlled dismantling, preservation during transport and reinstallation with recommissioning support. Our approach protects asset value and maintains recovery quality throughout.
Equipment condition recorded, tagged and documented before any work begins.
Systematic disconnection and dismantling following an approved engineering sequence.
Assets preserved and handled to maintain condition through transit.
Equipment reinstated and commissioned at the receiving location.

Our Capabilities
OUR RELOCATION PROCESS
Equipment inspected, documented and tagged before dismantling begins.
Engineering sequence and method statements prepared and approved.
Systematic disconnection in planned sequence with components labelled.
Rigging, loading and transport arranged to preserve asset condition.
Foundation and installation area prepared ahead of equipment arrival.
Equipment reinstated, aligned and commissioned at the new location.
WHY CHOOSE ELGC FOR PLANT RELOCATION
Documentation and handling approach protects equipment through the relocation cycle.
Sequence controlled by method statement to avoid damage or component loss.
Single team accountable across dismantling, transport and reinstallation.
Teams experienced working within operating plants during partial shutdowns.

Contact ELGC to discuss your asset relocation scope, sequence and timeline.