Replacement of a roller mill assembly within a planned shutdown window, including mechanical removal, installation of new unit and precision alignment before recommissioning.
Project Year
2024
Industry
Steel Manufacturing
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC carried out the replacement of a roller mill assembly within a planned shutdown window at a steel manufacturing facility in Abu Dhabi.
The scope included removal of the existing roller mill, preparation of the installation area, setting and alignment of the new unit, and all associated mechanical and E&I reinstatement work.
The project was completed within the planned outage window with commissioning checks confirmed before plant restart.

Technical Details
Client
Steel manufacturing client (identity withheld)
Location
Abu Dhabi, UAE
Project Duration
Planned shutdown window
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Shutdowns & Revamps
Scope of Work
Existing Mill Removal & Disposal
Foundation Preparation & Grouting
New Mill Erection & Alignment
Mechanical Commissioning Support
OEM Interface & Documentation
Key Highlights
Completed within planned shutdown window
Precision alignment achieved to manufacturer tolerance
All disciplines coordinated under single team