Loading...
Loading Excellence...
Loading...

Relocation & Dismantling
Al Ain, UAE
Controlled dismantling, documentation and export packing of a yogurt processing plant, preserving equipment condition and asset value for reinstallation at a new facility.
Project Year
2025
Industry
Food & Beverage
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC was engaged to carry out the complete dismantling, documentation and export packing of a yogurt processing plant at a facility in Al Ain.
The scope required systematic disconnection and dismantling following an approved engineering sequence, with all components tagged, documented and packed to preserve their condition for reinstallation at the client's new facility.
ELGC managed all rigging, heavy handling and packing activities, delivering a complete asset handover with documentation that supported the subsequent reinstallation programme.

Technical Details
Client
Food and beverage manufacturer (identity withheld)
Location
Al Ain, UAE
Project Duration
Three months
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Relocation & Dismantling
Scope of Work
Condition Assessment & Tagging
Controlled Mechanical Dismantling
Piping Isolation & Disconnection
Transport Coordination
Receiving Site Preparation
Key Highlights
All equipment tagged, documented and packed for reinstallation
Engineering sequence maintained to protect asset condition
Export packing prepared to client specification
Complete documentation package delivered with assets
Project Gallery
Documents
Let's build something great together.