Relocation & Dismantling
Abu Dhabi, UAE
Controlled dismantling, transport and reinstallation of a cooling tower unit to a new location within the same facility, including foundation preparation and recommissioning support.
Project Year
2021
Industry
Industrial
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC carried out the controlled dismantling and relocation of a cooling tower to a new position within an industrial facility in Abu Dhabi.
The scope included condition assessment, systematic dismantling, transport, foundation preparation at the receiving location, reinstallation, and recommissioning support.

Technical Details
Client
Confidential Client
Location
Abu Dhabi, UAE
Project Duration
12 Months
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Relocation & Dismantling
Scope of Work
Condition assessment and dismantling sequence planning
Controlled structural and mechanical dismantling
Transport and handling coordination
Foundation preparation at receiving location
Reinstallation, alignment and recommissioning
Key Highlights
Asset condition maintained through relocation sequence
Foundation prepared and handed over on programme
Recommissioning support provided at new location