Shutdowns & Revamps
Abu Dhabi, UAE
Replacement of scrap chutes during a planned outage window within a steel plant, including structural removal, new chute fabrication and installation.
Project Year
2024
Industry
Steel Manufacturing
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC carried out the replacement of scrap chutes at a steel manufacturing plant during a planned outage window.
The scope included removal of worn chutes, fabrication of replacement sections and installation with all associated structural and mechanical work completed within the shutdown window.

Technical Details
Client
Steel manufacturing client (identity withheld)
Location
Abu Dhabi, UAE
Project Duration
Planned shutdown window
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Shutdowns & Revamps
Scope of Work
Removal of existing scrap chutes
Fabrication of replacement chute sections
Structural modifications and supports
Installation, alignment and securing
Inspection and handback
Key Highlights
Removal and replacement completed within planned window
Chutes fabricated and pre-staged before shutdown commenced
Structural modifications incorporated within the same scope