Loading...
Loading Excellence...
Loading...
.jpeg&w=3840&q=75)
Environmental Systems
Abu Dhabi, UAE
Design, fabrication, installation and commissioning of a wet slurry extraction and disposal system for dust collection in a cold DRI plant area.
Project Year
2015
Industry
Steel Manufacturing
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC delivered a wet slurry extraction and disposal system for dust collection within the cold DRI plant area at a steel manufacturing facility in Abu Dhabi.
The scope included structural supports, wet extraction equipment installation, slurry piping and handling systems, E&I integration and commissioning.
.jpeg&w=3840&q=75)
Technical Details
Client
Confidential Client
Location
Abu Dhabi, UAE
Project Duration
12 Months
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Environmental Systems
Scope of Work
Structural supports and equipment bases
Wet extraction equipment installation
Slurry piping and disposal system installation
E&I integration and control hook-up
System commissioning and handover
Key Highlights
Wet slurry extraction system installed and commissioned
Structural, piping and E&I scopes delivered under one team
Successor to earlier dry extraction project at same facility
Project Gallery
Documents
Let's build something great together.