Environmental Systems
Abu Dhabi, UAE
Design, fabrication, installation and commissioning of a dry extraction dust collection system for a cold direct-reduced iron handling area within a steel plant.
Project Year
2020
Industry
Steel Manufacturing
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC delivered a dry extraction dust collection system for the cold DRI handling area at a steel plant in Abu Dhabi.
The scope included structural supports, ducting fabrication and installation, collection equipment erection, E&I integration and system commissioning.
.jpeg&w=3840&q=75)
Technical Details
Client
Confidential Client
Location
Abu Dhabi, UAE
Project Duration
12 Months
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Environmental Systems
Scope of Work
Structural supports and equipment bases
Ducting fabrication and installation
Dust collection equipment erection
E&I integration and control hook-up
System commissioning and performance verification
Key Highlights
Dry extraction system installed and commissioned within live plant
Structural, ducting and E&I scopes delivered under one team
System performance verified against design criteria